Maple Springs / 4 Corners Clean Up 2026-08-22
Saturday, August 22, 2026
Instagram Reel
Photo Album
Volunteers
Darshan Ahluwalia
Keith Eckstein
Sharon Aspinwal
Winston Gan
Christian Lutkemeyer
Chris Heck
Corey Ellerbroek
Andrew Matyseck
Kyle Mendivil
Jesus Ulloa
Brett Dean
Brian Valdez
Jenna Truong
Phillip Madison
Katrin Bath Teal
Jim Conger
Carlos Barrot
Jay Scott
Approximate person hours (car-to-car excluding additional riding): 48 hours
Including travel time to trailhead: 66.5 hours
Detailed Description
Pedaled up Maple Springs to Four Corners. Picked up trash at Four Corners. Several volunteers picked up trash along the entirety of Maple Springs Truck Trail up to Four Corners. A few volunteers stopped at the overlook on Modjeska Peak’s shoulder and picked up more trash there. Andrew found a half-melted carburetor, contractor nails and other crap that doesn’t belong on the mountain. We collected approximately twelve 33-gallon bags of trash and an automobile tire.
The majority of the crew (11 of hardy souls) continued on to summit Modjeska Peak, descend Buckthorn and then descend Motorway. All said and done, we biked 20 miles and 4.5k vertical and were back before lunch.
Some of the crew (a few not pictured)
Brian, Sasha, Brett and Andrew helped clean up the overlook on Modjeska’s shoulder
Modjeska Peak summit view
Some of the haul; another truck carried some other bags down. Can you believe all this crap was up there?