Motorway 2025-11-22
Saturday, November 22, 2025 - November 23, 2025
Photo Album
Volunteers
Chris Heck (2025-11-22 only)
Darshan Ahluwalia (2025-11-22, 11-23)
John Castro (2025-11-23 only)
Keith Eckstein (2025-11-23 only)
Estelle Pellegrino (2025-11-23 only)
Approximate person hours (car-to-car): 35 hours
Detailed Description
On Saturday, Darshan pedaled up Motorway with a full size McLeod and shovel. He restored an existing drain above a very rutted section of Motorway about halfway up the trail. Chris joined Darshan near the end of his 4 hour work session to put in the same amount of time, installing a new drain a little further up from Darshan’s. The hope is we prevent the very rutted section from worsening.
Restored existing drains here:
33.750628365372165, -117.58918586295535
33.750093957359326, -117.58783805881768
Installed new drains here:
33.75113668418191, -117.5893865354905
On Sunday, the following day, a larger crew of four total returned biking up with tools. Darshan worked high up solo, initially, and then joined Estelle, John and Keith. The four of together worked on retreading a rutted section as well re-doing a large right hand turn. Both sections were redone with new drainage.
Restored existing water diversions here:
33.75009416206277, -117.58785696488465
33.75307286144533, -117.59083665802386
Installed new drains here:
33.74943788636176, -117.58908822202172
33.750585866533974, -117.58919250238293