Winterwize Motorway (2026-10-25)

Sunday, October 25, 2026

Instagram Reel

Photo Album

Volunteer(s)

  1. Darshan Ahluwalia

  2. Keith Eckstein

  3. John Castro

  4. Todd Lounsbury

  5. Craig Dicht

  6. Chris Heck

  7. Adam Atkinson

  8. Kevin Haynes

  9. Daniel Camacho

  10. Mayur Pandya

  11. Caden Nguyen

  12. Caden’s Dad

  13. Caden’s Sister

Detailed Description

  • Total person hours, car to car: 46

  • Total roundtrip drive time: 13

  • Total person hours: 59

We repaired and installed drains on Motorway.

Installed new drains:

33.74967567227058, -117.58645948630708

Repaired existing drains:

33.749231, -117.586592

33.749176, -117.586599

33.748336, -117.586672

33.747950, -117.586861

33.747897, -117.587022

33.747873, -117.587000

33.748586, -117.587108

33.748917, -117.587317

33.749440, -117.589016

33.749120, -117.589139

Repaired approximately 4 more existing drains, but didn’t record the gps locations.