Motorway Drain Work (2026-11-01)

Sunday, November 1, 2026

Photo Album

Volunteer(s)

  1. Keith Eckstein

Detailed Description

  • Total person hours, car to car: 6

  • Total roundtrip drive time: 1

  • Total person hours: 7

Follow up to last Sunday’s tread work. Checking how the drains survived last night’s rain. Silverado Canyon community got about .75-inch of rain.

When I reached the stopping point from last Sunday’s tread work (33.749433, -117.589002), I began searching for existing drains to repair as I continued hiking up.

At the end of the day, repaired 4, created 1 new. For some unknown reason, my phone did not record the gps location in the photos for these 5.

Having said that, the last repaired drain is here (33.75362989464708, -117.59240452348651), which is a USFS metal scupper. No photos of this one.

The new drain is approximately here (33.753416305944626, -117.59221615597652).

Previous
Previous

Motorway Drain Work (2026-11-15)

Next
Next

Winterwize Motorway (2026-10-25)